Field Calculators

Columns, post holes, footings & steps

0.12 CY6 bags of 80 lb
Concrete
0.12 CY · 3.14 ft³
80 lb bags
6 bags
60 lb bags
7 bags
50 lb bags
9 bags

These sketches are here to help you order material and price the work quickly. They are not engineered or shop drawings — always build from your approved project drawings.

Adjust▾
Show the math▾
  1. One
    π ÷ 4 × diameter² × height
    π ÷ 4 × 1' 0" ² × 4' 0" = 3.142 ft³
  2. Total
    one × how many
    3.142 ft³ × 1 = 0.116 CY
  3. 80 lb bags
    ft³ ÷ 0.60 ft³ per bag, rounded up
    3.14 ft³ ÷ 0.60 = 6

Where the numbers come from

  • Bag yield: 80 lb = 0.60 ft³ · 60 lb = 0.45 ft³ · 50 lb = 0.375 ft³QUIKRETE 5000 data sheet (same figures as the slab calculator). High-yield and fast-setting mixes differ — check the bag.Source
  • Post sizes in the hole: 4×4 = 3½" · 6×6 = 5½" · 8×8 = 7¼" actualDressed softwood sizes: nominal less ½" up to 6", less ¾" above. The post is assumed to go to the bottom of the hole; if it sits on gravel, enter the concrete depth only.Source

Saved results

Nothing saved yet. Tap Save to keep a result on this device.

Concrete for round columns, post holes (less the post), square footings and solid steps.