Rebar for a reinforced block wall: vertical bars in grouted cells — full height or 6'8" lift bars — bond-beam bars, drill-in dowels with the epoxy they take, laps and the stock bars to buy.
CMU wall rebar calculator
10 stock bars (20' 0")200.0 LF of rebar · 208.6 lb
- Vertical #5 bars
- 11 × 10' 0"
- Vertical steel (with laps)
- 110.0 LF
- Bond-beam #5 bars
- 2 × 40' 0"
- Bond-beam steel (with laps)
- 90.0 LF
- Laps (30" each)
- 4 laps
- Stock bars to buy
- 10 × #5
- #5 weight
- 208.6 lb
These sketches are here to help you order material and price the work quickly. They are not engineered or shop drawings — always build from your approved project drawings.
A bar at each end plus one each side of every opening. Real bars sit in block cells, so spacing goes in 8" steps.
Vertical barsDowels into the slab or footing
Bond beams (horizontal bars)
Bars per bond beam
Lap = bar diameter × 48 (Grade 60, IBC 2107.2 alternative). Use the lap on your drawings when it is given.
Adjust▾
Show the math▾
- Vertical bars at the spacingwall length ÷ spacing, rounded up, + 1 (a bar at each end)40 × 12 ÷ 48 (in), rounded up, + 1 = 11
- Lap lengthbar diameter × lap diameters#5: 0.625 × 48 (in) = 2' 6"
- Vertical steelbars × wall height11 × (10) (ft) = 110' 0"
- Bond-beam steelbond beams × bars each × (length + laps)1 × 2 × (40 + 2 × 2.5) (ft) = 90' 0"
- #5 weightfeet × lb per foot (ASTM A615)200 × 1.043 = 208.6 lb
- #5 stock barsfull pieces + cut pieces packed into stock bars20' bars = 10
Where the numbers come from
- Bar layout: Vertical: ⌈wall length ÷ spacing⌉ + 1 (a bar at each end) + 2 per opening; bond beams: bars × wall lengthGeometry only. Real bars sit in the block cells, so the spacing is a multiple of 8" and a bar can move a cell to clear an opening or a control joint. Bars at corners, wall intersections and jambs follow your structural drawings.
- Lift bars (6'8"): Low-lift grouting: build at most 5'4", set the bars, grout, repeat — bars are spliced at each pour heightCMHA CMU-FAQ-005: low-lift sections are no taller than 5'4" and "continuity of the reinforcement is maintained by splicing between each section". 6'8" (80") is a 20' bar cut in three with no waste, short enough for the mason to lift block over. In a 4' (48") lift it sticks up 80 − 48 = 32" — a full lap for #4 (24") and #5 (30") at 48 diameters, but not #6 (36"). A new bar is set at every pour height, so pieces per location = ⌈(height − bar) ÷ lift⌉ + 1, each lapping the one below by bar − lift, with the top piece cut to fit.Source
- Lap length: 48 bar diameters for Grade 60 (#4 = 24", #5 = 30", #6 = 36")The IBC 2107.2 alternative for allowable stress design, as summarized by ENERCALC: 40 diameters for 40 ksi bars, 48 for 60 ksi. The TMS 402 development-length equation (Eq. 6-1) depends on masonry strength, cover and bar size and often gives longer laps (up to 72 diameters) — use the lap on your structural drawings when it is given.Source
- TMS 402 lap equation: ld = 0.13 × db² × fy × γ ÷ (K × √f′m), at least 12"; γ = 1.0 (#3–#5), 1.3 (#6–#7), 1.5 (#8+)Masonry Advisory Council summary of TMS 402. K is the smallest of the cover, the clear spacing between splices and 9 db. Not computed here — it needs f′m and cover from the design.Source
- Drill-in dowels: One per vertical bar; length = embedment (4" default) + one lap above the slab or footingThe first vertical bar laps the dowel. The embedment is your engineer's or the adhesive report's number — 4" is only the default; adhesive makers list minimum embedments per bar size (e.g. Hilti HIT-HY 200 V3: #4 2¾", #5 3⅛", #6 3½").
- Epoxy per anchor: Average of the gap (π ÷ 4 × (hole² − steel²) × embedment) and the hole ⅔ full (⅔ × π ÷ 4 × hole² × embedment)Installers fill the hole about ⅔ full; what the anchor pushes out of the hole is lost, so the real use is between the gap alone and the ⅔ fill — taken as the average of the two. The total is rounded up to a whole fl oz. Waste, if entered, is added on top for rough holes and hard conditions.
- Drilled hole size (ANSI B212.15): Carbide bit tips (in.): 7/16 0.458–0.468 · ½ 0.520–0.530 · 9/16 0.582–0.592 · ⅝ 0.650–0.660 · 11/16 0.713–0.723 · ¾ 0.775–0.787 · ⅞ 0.905–0.917 · 1 1.030–1.042 · 1⅛ 1.160–1.175 · 1⅜ 1.410–1.425 · 1½ 1.535–1.550A bit drills a little over its name; the hole is taken at the middle of the range (7/16 → 0.463, ⅞ → 0.911, 1½ → 1.5425). A hole size you type that is not a standard bit is used as typed.Source
- Threaded rod steel: d − 5√3 ÷ 16 × pitch: halfway between the outside of the rod and its thread root (d − 5√3 ÷ 8 × pitch) · UNC ⅜-16, ½-13, ⅝-11, ¾-10, ⅞-9, 1-8, 1¼-7Thread geometry (ASME B1.1, H = √3 ÷ 2 × pitch). The epoxy fills the thread grooves, so a rod holds less steel than a solid bar of its size (¾" → 0.6959", ½" → 0.4584"). Rebar uses its nominal size (#10 = 1.270").
- Extension tube: Past 8" deep: (embedment − 8") × 0.17 fl oz per inch, a new tube every 10 anchorsA mixing nozzle reaches about 8"; deeper holes are filled from the bottom through an extension tube, which holds 0.17 fl oz per inch (the inside of a ⅝" bore: π ÷ 4 × 0.625² = 0.307 in³ per inch) and is replaced every 10 anchors.
- Cartridges: Sizes in mL as printed, fl oz worked out (mL ÷ 29.5735) · Hilti HIT-HY 200 V3 330 / 500 mL = 11.2 / 16.9 fl oz · DeWalt AC100+ Gold 280 / 825 mL = 9.5 / 27.9 fl ozWhat a cartridge really gives, after the nozzle and the first mix: 9.07 fl oz from the 9.5 oz and 27.29 fl oz from the 28 oz AC100+ Gold. Hilti lists none, so its packs are taken at 96%.
- Hilti HIT-HY 200 V3: Bits: rod ⅜→7/16 · ½→9/16 · ⅝→¾ · ¾→⅞ · ⅞→1 · 1→1⅛ · 1¼→1⅜ · rebar #3→½ · #4→⅝ · #5→¾ · #6→⅞ · #7→1 · #8→1⅛ · #10→1½ · foil packs 330 and 500 mLHilti Anchor Fastening Technical Guide Ed. 22, Table 38 (threaded rod) and Table 18 (rebar); the same bits in grouted CMU (Masonry Anchor Design Guide 2023, Table 1); ICC-ES ESR-4868 (revised April 2026) §3.2.1 for the 330 / 500 mL packs. Hilti lists a bigger bit for deep embedment (#6 1", #7 1⅛", #8 1¼") — type it if you drill that deep. Hilti's own Volume Calculator is a phone app.Source
- DeWalt AC100+ Gold: Bits: rod ⅜→7/16 · ½→9/16 · ⅝→11/16 · ¾→⅞ · ⅞→1 · 1→1⅛ · 1¼→1⅜ · rebar #3→7/16 · #4→⅝ · #5→¾ · #6→⅞ · #7→1 · #8→1⅛ · #10→1½ · cartridges 280 mL (8478SD-PWR) and 825 mL (8490SD-PWR)DeWalt AC100+ Gold Technical Guide ©2025 rev. K (p. 2 installation, p. 29 ordering), matching ICC-ES ESR-2582 (Feb 2026) Table 9. Approved for rebar used as an anchor (embedment up to about 12 bar diameters), not for post-installed rebar development or splices.Source
- Hole size rule (the cross-check): Bit = anchor + adhesive ring, in 1/16" steps: rod + 1/16" up to ⅝", + ⅛" above · rebar (actual size) + ⅛" · every maker's bit is checked to leave 1/32"–3/16" of ring each sideA cross-check on every maker's bit, and the answer wherever a maker's number cannot be found. Makers may call for a different size — type your hole size if so.
- Method source: DeWalt Adhesive Anchor Volume EstimatorThe ⅔ fill, the extension tube and the usable cartridge follow it; every number on this page is also worked out by math.Source
- Rebar weights (ASTM A615): #4 0.668 · #5 1.043 · #6 1.502 · #7 2.044 · #8 2.670 lb/ftThe same table the rebar calculator uses: bar area × 3.40 lb/ft per in².Source
- Stock bars: Lapped bars use full stock pieces plus a cut piece; lift bars and cut pieces are packed into stock bars longest firstOffcuts that fit another cut piece are reused — three 6'8" lift bars come out of one 20' bar. Waste, if entered, is added to the stock bar count only.
Saved results